Takeoff & Estimate

Interactive plan markup · I-65 Retail Pad (Messer)

AI-assisted
Estimate total
$1.3M
Approved items
18/18
Avg confidence
86%
approved lines
Divisions
6

Bid pricing

Price to win · Messer · base margin 17.6%

Approved cost
$1.3M
Bid price
$1.5M
Profit
$229.9K
17.6%
Coin-flip 14.7%Base 17.6%

Bid price = approved-line cost × (1 + margin). Widen the margin for more profit; the win-probability gauge updates live as price moves away from Messer’s competitive range.

40%Win probability
GC relationship82%
Price competitiveness40%
Schedule fit71%

Coin-flip line at 14.7%margin — above it, you’re more likely to lose than win.

Plan sheet C-300 — markup

Grading & utility plan · 1px = 0.5 ft scale

125'-0"storm main
Click start point, then end point
Building footprintUtilitiesPaving / parkingYour markup
Measurements
0 LF0 SF0 count
No measurements yet. Use Distance, Area or Count to mark up the plan.

Line items by division

Toggle Approve to include a line in the estimate

Strip & stockpile topsoil
8,340 CY × $4.45
92%$37.1K
Mass excavation / cut
20,200 CY × $9.81
97%$198.2K
Structural fill & compaction
8,250 CY × $12.45
83%$102.7K
Fine grade building pad
49,430 SF × $0.59
79%$29.2K
15" RCP storm pipe
2,170 LF × $44.27
96%$96.1K
Area drain / catch basin
15 EA × $2,970.40
97%$44.6K
Detention pond grading
1,760 CY × $9.08
74%$16K
8" PVC sanitary main
760 LF × $58.73
80%$44.6K
Sanitary manhole
4 EA × $6,288.03
74%$25.2K
8" DIP water main
1,130 LF × $79.51
89%$89.8K
Fire hydrant assembly
7 EA × $6,416.27
88%$44.9K
Gate valve & box
11 EA × $2,019.74
95%$22.2K
Aggregate base course
3,710 TON × $30.84
86%$114.4K
Asphalt binder + surface
2,300 TON × $99.86
96%$229.7K
Pavement striping & signage
22,660 SF × $0.52
75%$11.8K
Curb & gutter
2,090 LF × $32.03
74%$66.9K
Sidewalk / flatwork
15,470 SF × $7.24
90%$112K
Dumpster pad & approach
3 EA × $6,963.09
83%$20.9K